Demonstrator
Operational from 2022, Mar
The first GEVI turbine was 3D printed and tested on-field and it has demonstrated more than a 2x increase in power efficiency, proving the technology feasibility in real life.
The first GEVI turbine was 3D printed and tested on-field and it has demonstrated more than a 2x increase in power efficiency, proving the technology feasibility in real life.
GEVI pilot will be tested to prove real-scale feasibility and collect data from pilot installation and train the AI.
GEVI S.R.L.
Piazza Nilde Iotti, 13, 56025, Pontedera (PI)
VAT: 02450340506