<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>wind energy Archivi - GEVI</title>
	<atom:link href="https://www.geviwind.com/category/wind-energy/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.geviwind.com/category/wind-energy/</link>
	<description>THE FUTURE OF WIND POWER</description>
	<lastBuildDate>Mon, 23 Mar 2026 12:42:43 +0000</lastBuildDate>
	<language>it-IT</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://www.geviwind.com/wp-content/uploads/2022/11/cropped-favicon-gevi-32x32.png</url>
	<title>wind energy Archivi - GEVI</title>
	<link>https://www.geviwind.com/category/wind-energy/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Europe’s Energy Price Volatility Is Forcing a Rethink of Where Power Comes From</title>
		<link>https://www.geviwind.com/2026/03/23/europe-energy-market-volatility/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Mon, 23 Mar 2026 12:15:56 +0000</pubDate>
				<category><![CDATA[Energy price]]></category>
		<category><![CDATA[renewables]]></category>
		<category><![CDATA[towards the future]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=1107</guid>

					<description><![CDATA[<p>Energy Price Volatility Is Forcing a Rethink of Where Power Comes From A crisis between crises — energy price volatility is no longer a short-term risk: it is a structural...</p>
<p>L'articolo <a href="https://www.geviwind.com/2026/03/23/europe-energy-market-volatility/">Europe’s Energy Price Volatility Is Forcing a Rethink of Where Power Comes From</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1></h1>
<div class="page">
<h1 class="headline">Energy Price Volatility Is Forcing a Rethink of Where Power Comes From</h1>
<h3 class="standfirst"><strong>A crisis between crises — energy price volatility is no longer a short-term risk: it is a structural reality in Europe.</strong></h3>
<div class="meta">Mar 23rd 2026 <span class="separator">| </span>3 min read</div>
<div></div>
<div>
<hr />
</div>
<p>&nbsp;</p>
<p>In the space of three weeks, the Middle East has gone from a regional conflict to a full-scale energy war — and Europe sits directly in the line of fire. On March 18, Israeli forces struck South Pars, the world&#8217;s largest natural gas reserve, holding an estimated 1,800 trillion cubic feet of gas. Iran retaliated swiftly. Qatar&#8217;s Ras Laffan Industrial City — the world&#8217;s largest LNG production facility, responsible for roughly 20% of global LNG supply — was struck by Iranian missiles, causing extensive damage and shutdowns.</p>
<div class="body">
<p>Europe&#8217;s gas benchmark jumped 6% in a single day. Analysts at Wood Mackenzie said the attacks &#8220;fundamentally reshape the global LNG outlook,&#8221; with disruption likely to last more than two months. This is not a tail risk. Europe, structurally dependent on imported LNG to replace Russian pipeline gas, is among the most exposed economies on the planet.</p>
<h3>How We Got Here: From Covid to Ukraine to the Gulf</h3>
<p>The roots of this instability stretch back to 2020, when the Covid-19 pandemic caused energy demand — and prices — to collapse. The rebound in 2021 pushed euro area wholesale electricity prices up by more than 400% within a single year. Russia&#8217;s full-scale invasion of Ukraine in 2022 transformed disruption into a geopolitical shock, cutting off a supply that had accounted for 45% of EU gas imports and exposing structural dependence on Russian pipeline gas.</p>
<p>The consequences remain severe: in 2023, household gas prices were still almost twice pre-crisis levels, while European companies faced energy costs two to four times higher than competitors in the United States and China.</p>
<h3>A System Still Dependent on the Outside World</h3>
<p>Despite diversification efforts, the EU continues to import approximately 57% of the energy it consumes, including 94.9% of oil and around 90% of natural gas. This means prices are driven above all by external factors — geopolitical tensions, global markets, and LNG availability. When the Strait of Hormuz effectively closed, European gas prices surged around 20% in a single morning.</p>
<p>Europe&#8217;s vulnerability was compounded by low storage levels: 46 bcm in February 2026, down from 60 bcm in 2025 and 77 bcm in 2024. Forecasts now point to gas prices around 40% higher than expected for 2026, with levels exceeding €100/MWh and remaining elevated through 2027.</p>
<p><img fetchpriority="high" decoding="async" class="wp-image-1121 aligncenter" src="https://www.geviwind.com/wp-content/uploads/2026/03/Screenshot-2026-03-23-131108-300x219.png" alt="" width="874" height="638" srcset="https://www.geviwind.com/wp-content/uploads/2026/03/Screenshot-2026-03-23-131108-300x219.png 300w, https://www.geviwind.com/wp-content/uploads/2026/03/Screenshot-2026-03-23-131108-1024x749.png 1024w, https://www.geviwind.com/wp-content/uploads/2026/03/Screenshot-2026-03-23-131108-768x562.png 768w, https://www.geviwind.com/wp-content/uploads/2026/03/Screenshot-2026-03-23-131108.png 1330w" sizes="(max-width: 874px) 100vw, 874px" /></p>
<h3>The Pattern Is Unmistakable</h3>
<p>Recent crises reveal a recurring pattern: geopolitical shock, supply disruption, price spike, economic impact. What is new in 2026 is the simultaneity — the Strait of Hormuz disrupted, South Pars struck, and Ras Laffan damaged within weeks. As long as a significant share of European energy remains tied to imported fossil fuels — still around 57%, compared to 24% in China and 37% in India — external conflicts will continue to translate directly into domestic risk.</p>
<h3>The Diversification Trap</h3>
<p>Europe has diversified its gas supply. Russia&#8217;s share has fallen from 40% to 13%, replaced by Norway, the United States, and Algeria. On paper, the vulnerability has been addressed. In reality, diversification solved the supply problem but not the price problem. As long as fossil fuels dominate the system, prices are set on global markets that Europe does not control. When Ras Laffan burns — despite representing only about 3% of direct EU supply — prices still jump across the continent.</p>
<p>Europe has replaced dependence on a single supplier with dependence on a volatile global market. You cannot diversify your way out of that system — you can only build your way out of it.</p>
<h3>Renewables: From Environmental Choice to Strategic Shield</h3>
<p>In this context, renewable energy is no longer primarily an environmental argument. It is a security argument. In 2024, renewables accounted for 47.5% of EU electricity consumption, up from 15.9% in 2004. Unlike fossil fuels, they are local, predictable, and not exposed to global market volatility or geopolitical disruption. Each additional megawatt reduces exposure to exactly the kind of shocks Europe is facing today.</p>
<h3>Conclusion: The Cost of Delay</h3>
<p>Europe today faces a choice that is no longer theoretical. The world&#8217;s largest gas field is damaged. The world&#8217;s largest LNG terminal is shut. Brent crude is above $110. European gas prices are rising. The question is not whether to transition away from imported fossil fuels, but how long Europe can delay before doing so under pressure rather than strategy.</p>
<p>Every year of continued dependency is another year of exposure to a system that has repeatedly proven unreliable. The technology exists — the only question is how many more crises it will take.</p>
<div class="sources">
<h3>Sources</h3>
<ol>
<li><strong>European Central Bank</strong> — Energy price developments in and out of the COVID-19 pandemic (2022): <a href="https://www.ecb.europa.eu/press/economic-bulletin/articles/2022/html/ecb.ebart202204_01~7b32d31b29.en.html">ecb.europa.eu</a></li>
<li><strong>European Commission</strong> — Report on Energy Prices and Costs in Europe (February 2025): <a href="https://energy.ec.europa.eu/data-and-analysis/energy-prices-and-costs-europe_en">energy.ec.europa.eu</a></li>
<li><strong>Eurostat</strong> — Energy in Europe, 2026 edition: <a href="https://ec.europa.eu/eurostat/web/interactive-publications/energy-2026">ec.europa.eu</a></li>
<li><strong>Bruegel</strong> — How will the Iran conflict hit European energy markets? (March 2026): <a href="https://www.bruegel.org/first-glance/how-will-iran-conflict-hit-european-energy-markets">bruegel.org</a></li>
<li><strong>Bloomberg / HSBC</strong> — Europe faces high war-related gas prices through 2027 (March 2026): <a href="https://www.bloomberg.com/news/articles/2026-03-16/europe-faces-high-war-related-gas-prices-through-2027-hsbc-says">bloomberg.com</a></li>
<li><strong>Goldman Sachs</strong> — How will the Iran conflict impact oil prices?: <a href="https://www.goldmansachs.com/insights/articles/how-will-the-iran-conflict-impact-oil-prices">goldmansachs.com</a></li>
<li><strong>Ember</strong> — Shockproof: how electrification can strengthen EU energy security (November 2025): <a href="https://ember-energy.org/latest-insights/shockproof-how-electrification-can-strengthen-eu-energy-security">ember-energy.org</a></li>
<li><strong>CNN</strong> — What is the South Pars gas field and why is Israel&#8217;s attack an escalation? (March 19, 2026): <a href="https://www.cnn.com/2026/03/19/middleeast/iran-qatar-south-pars-gas-field-explainer-intl">cnn.com</a></li>
<li><strong>Al Jazeera</strong> — Qatar says Iran attack caused significant damage at Ras Laffan gas facility (March 18, 2026): <a href="https://www.aljazeera.com/news/2026/3/18/qatar-says-iran-missile-attack-sparks-fire-causes-damage-at-gas-facility">aljazeera.com</a></li>
<li><strong>Wood Mackenzie</strong> — cited via CNN: attacks fundamentally reshape global LNG outlook (March 2026)</li>
<li><strong>IMF Working Paper WP/25/7</strong> — Shocked: Electricity Price Volatility Spillovers in Europe (January 2025): <a href="https://www.imf.org/-/media/files/publications/wp/2025/english/wpiea2025007-print-pdf.pdf">imf.org</a></li>
</ol>
</div>
</div>
</div>
<p>&nbsp;</p>
<p>L'articolo <a href="https://www.geviwind.com/2026/03/23/europe-energy-market-volatility/">Europe’s Energy Price Volatility Is Forcing a Rethink of Where Power Comes From</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>GEVI&#8217;S FUTURE: FLOATING OFF-SHORE</title>
		<link>https://www.geviwind.com/2023/06/29/gevis-future-floating-off-shore/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Thu, 29 Jun 2023 11:37:49 +0000</pubDate>
				<category><![CDATA[offshore]]></category>
		<category><![CDATA[towards the future]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=780</guid>

					<description><![CDATA[<p>What will be the way of Gevi? Find out with us! vol. 15 29 June 2023 GEVI&#8217;S FUTURE: FLOATING OFF-SHORE By Edoardo Simonelli, Eleonora Cacchio &#160; The potential of offshore...</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/06/29/gevis-future-floating-off-shore/">GEVI&#8217;S FUTURE: FLOATING OFF-SHORE</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>What will be the way of Gevi?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 15</strong></p>
<p><strong>29 June 2023</strong></p>
<h2>GEVI&#8217;S FUTURE: FLOATING OFF-SHORE</h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p><span class="TextRun SCXW214353368 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="none"><span class="NormalTextRun SCXW214353368 BCX8">The potential of offshore wind power is well known, but the complexity of installation and maintenance processes poses significant challenges.</span></span></p>
<p>The main issue lies in the foundations. The sea floor’s depths below 50 meters prevents the installation of wind farms far from land where they could take advantage of wind intensity at higher altitudes and latitudes.</p>
<p>In recent years, new designs for offshore wind power systems on floating platforms are being developed to be able to produce energy on the deep sea. However, this is not yet a competitive solution since the cost of the floating offshore platform increases as the size of the unit it supports grows and as the height of the wind unit&#8217;s center of mass rises.</p>
<p>In other words, the tall rotor height of traditional wind turbines (HAWT) requires large floating platforms to balance the center of mass and prevent the structure from capsizing during extreme weather conditions.</p>
<blockquote><p>The future of offshore wind power definitely remains on floating platforms, and GEVI turbines are perfect to make it happen!</p></blockquote>
<p>Firstly, their lightweight structure and low center of mass greatly reduce the minimum size of platforms needed to support them and simplify maintenance processes. Moreover, the gyroscopic effect around the vertical axis helps to stabilize the balance of the turbines.</p>
<p>In addition, it is possible to install multiple turbines close together and create “<em><strong>energy islands</strong></em>” in deep sea with improving their overall productivity and sharing the power electronic optimizing also the energy distribution process. Artificial intelligence (A.I.) and active blade pitch control enable interconnection between turbines; they will exchange data with each other and proactively adapt to strong sea winds, enhancing their performance.</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/06/29/gevis-future-floating-off-shore/">GEVI&#8217;S FUTURE: FLOATING OFF-SHORE</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>OFFSHORE WIND POWER DEVELOPMENT</title>
		<link>https://www.geviwind.com/2023/05/25/offshore-wind-power-development/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Thu, 25 May 2023 11:38:25 +0000</pubDate>
				<category><![CDATA[offshore]]></category>
		<category><![CDATA[renewables]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=769</guid>

					<description><![CDATA[<p>How widespread is offshore wind power? Find out with us! vol. 14 25 May 2023 OFFSHORE WIND POWER DEVELOPMENT  By Edoardo Simonelli, Eleonora Cacchio &#160; Only 12% of European wind...</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/05/25/offshore-wind-power-development/">OFFSHORE WIND POWER DEVELOPMENT</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>How widespread is offshore wind power?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 14</strong></p>
<p><strong>25 May 2023</strong></p>
<h2><span class="TextRun SCXW121370774 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW121370774 BCX8">OFFSHORE WIND </span><span class="NormalTextRun SCXW121370774 BCX8">POWER </span><span class="NormalTextRun SCXW121370774 BCX8">DEVELOPMENT</span></span><span class="EOP SCXW121370774 BCX8" data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p><span data-contrast="auto"><span class="TextRun SCXW214353368 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW214353368 BCX8">Only </span></span><strong><a href="https://windeurope.org/intelligence-platform/product/wind-energy-in-europe-2022-statistics-and-the-outlook-for-2023-2027/"><span class="TextRun SCXW214353368 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="none"><span class="NormalTextRun SCXW214353368 BCX8">12%</span></span></a></strong><span class="TextRun SCXW214353368 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"> <span class="NormalTextRun SCXW214353368 BCX8">of European wind power capacity is currently offshore, i.e., installed on the seabed or floating on the deep sea and connected to submarine power lines to conduct electricity to the distribution grid.</span></span> </span></p>
<p><span data-contrast="auto">That&#8217;s because the installation, operation and maintenance costs of offshore wind farms are far higher than onshore of installations, just think of the differences between transporting by land and by sea the equipment needed to perform any kind of maintenance operation on the wind turbine. In addition, offshore systems are subject to a greater rate of erosion or risk of damage due to wave action and strong winds that develop during storms.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">Technological and engineering improvements in the last few years have made it possible to increase the reliability of the blades by reducing some of the maintenance costs, but we are still a long way from the true “green revolution” that would take place if governments incentivized the development of offshore wind power.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<blockquote><p><span data-contrast="auto">With 11.700 square kilometers of coastline, Italy is particularly well-suited for the deployment of this technology, which is the basis for national energy renewal according to the <em>National Integrated Energy and Climate Plan</em> (</span><a href="https://www.mimit.gov.it/images/stories/documenti/PNIEC_finale_17012020.pdf"><b><span data-contrast="none">PNIEC</span></b></a><span data-contrast="auto">). </span></p></blockquote>
<p><span data-contrast="auto">In particular, at least </span><b><span data-contrast="auto">900 MW</span></b><span data-contrast="auto"> of offshore wind farms are planned to be installed to achieve the 2030 climate and energy targets. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<p><span class="TextRun SCXW247464749 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW247464749 BCX8">The first offshore </span><span class="NormalTextRun SCXW247464749 BCX8">wind power </span><span class="NormalTextRun SCXW247464749 BCX8">installation in the Mediterranean Sea, </span><span class="NormalTextRun SCXW247464749 BCX8">which is called </span></span><a href="https://www.gruppoiren.it/it/everyday/abcircular/2022/o-come-offshore-cosa-sono-gli-impianti-eolici-offshore-e-come-funzionano.html"><strong><span class="TextRun SCXW247464749 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="none"><span class="NormalTextRun SpellingErrorV2Themed SCXW247464749 BCX8">Beleolico</span></span></strong></a><span class="TextRun SCXW247464749 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW247464749 BCX8">, </span><span class="NormalTextRun SCXW247464749 BCX8">has a capacity of 30 MW and was inaugurated on 21 April 2022 off the coast of Taranto. It can</span><span class="NormalTextRun AdvancedProofingIssueV2Themed SCXW247464749 BCX8"> cover</span><span class="NormalTextRun SCXW247464749 BCX8"> the </span><span class="NormalTextRun SCXW247464749 BCX8">annual energy needs of about 60.</span><span class="NormalTextRun SCXW247464749 BCX8">000 households by producing 58</span><span class="NormalTextRun SCXW247464749 BCX8">.</span><span class="NormalTextRun SCXW247464749 BCX8">000 MWh</span><span class="NormalTextRun SCXW247464749 BCX8">/year and will save 730.</span><span class="NormalTextRun SCXW247464749 BCX8">000 tons of carbon dioxide over the next 25 years</span> <span class="NormalTextRun SCXW247464749 BCX8">acco</span><span class="NormalTextRun SCXW247464749 BCX8">rding to experts</span><span class="NormalTextRun SCXW247464749 BCX8">.</span></span><span class="EOP SCXW247464749 BCX8" data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">What are the main reasons </span>that drove the attention of national governments to offshore wind power?<span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> Certainly, its <a href="https://modofluido.hydac.it/eolico-offshore"><strong>advantages</strong></a> over onshore wind power, such as:</span></p>
<ul>
<li data-leveltext="" data-font="Symbol" data-listid="6" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:360,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}" aria-setsize="-1" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">the </span><em>greater reliability</em><span data-contrast="auto"> of the energy source since offshore, where there is no obstacle whatsoever, the wind is stronger and more constant than onshore; </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></li>
<li data-leveltext="" data-font="Symbol" data-listid="6" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:360,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}" aria-setsize="-1" data-aria-posinset="2" data-aria-level="1"><span data-contrast="auto">the </span><em>lower environmental and noise impact</em><span data-contrast="auto"> since the wind turbines are located beyond the visible horizon line.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></li>
</ul>
<p>L'articolo <a href="https://www.geviwind.com/2023/05/25/offshore-wind-power-development/">OFFSHORE WIND POWER DEVELOPMENT</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UPCOMING WIND POWER DEVELOPMENT</title>
		<link>https://www.geviwind.com/2023/05/04/upcoming-wind-power-development/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Thu, 04 May 2023 11:42:36 +0000</pubDate>
				<category><![CDATA[onshore]]></category>
		<category><![CDATA[renewables]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=765</guid>

					<description><![CDATA[<p>How much can we expect wind power to grow? Find out with us! vol. 13 04 May 2023 UPCOMING WIND POWER DEVELOPMENT By Edoardo Simonelli, Eleonora Cacchio &#160; According to...</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/05/04/upcoming-wind-power-development/">UPCOMING WIND POWER DEVELOPMENT</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>How much can we expect wind power to grow?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 13</strong></p>
<p><strong>04 May 2023</strong></p>
<h2>UPCOMING WIND POWER DEVELOPMENT</h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p><span data-contrast="auto">According to the most recent </span><a href="https://gwec.net/globalwindreport2023/"><span data-contrast="none">GWEC </span></a><span data-contrast="auto">estimates, 2023 will see the record for new wind capacity installed for the fourth year in a row reaching 100 GW globally.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">This is only the beginning of a global year-on-year growth rate (</span><b><span data-contrast="auto">CAGR</span></b><span data-contrast="auto">) </span><b><span data-contrast="auto">of 13%</span></b><span data-contrast="auto"> that will hopefully result in 1.221 GW of new wind capacity over the next seven years, reaching the </span><b><span data-contrast="auto">2 TW</span></b><span data-contrast="auto"> threshold </span><b><span data-contrast="auto">by 2030</span></b><span data-contrast="auto">.</span></p>
<p><span data-contrast="auto">Onshore installations will naturally play a leading role in this global growth, but what are the effects of increased wind power capacity?</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">Based on </span><a href="https://gwec.net/developing-economies-can-seize-economic-opportunities-from-wind-power-in-the-current-crisis/"><span data-contrast="none">industry experience</span></a><span data-contrast="auto">, a country that installs </span><b><span data-contrast="auto">1 GW of onshore wind power each year for five years</span></b><span data-contrast="auto"> will be able to power 5,9 million houses at the end of the fifth year, while saving as much as 34,6 million gallons of water per year that would have been otherwise used for thermoelectric generation. </span><span data-contrast="auto">In addition, over the entire life cycle of wind farms, $19,3 billion in gross value added to the national economy and 414.000 jobs can be unlocked, as well as 290 million metric tons of CO2e saved.</span></p>
<p><span class="TextRun SCXW8663884 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW8663884 BCX0">In the case of the </span></span><a href="https://windeurope.org/intelligence-platform/product/wind-energy-in-europe-2022-statistics-and-the-outlook-for-2023-2027/"><span class="TextRun SCXW8663884 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="none"><span class="NormalTextRun SCXW8663884 BCX0">E</span><span class="NormalTextRun SCXW8663884 BCX0">uropean </span><span class="NormalTextRun SCXW8663884 BCX0">U</span><span class="NormalTextRun SCXW8663884 BCX0">nion</span></span></a><span class="TextRun SCXW8663884 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW8663884 BCX0">, it would need to install </span></span><span class="TextRun SCXW8663884 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW8663884 BCX0">30 GW </span><span class="NormalTextRun SCXW8663884 BCX0">a year</span></span><span class="TextRun SCXW8663884 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"> <span class="NormalTextRun SCXW8663884 BCX0">of new wind </span><span class="NormalTextRun SCXW8663884 BCX0">farms to meet its 2030</span><span class="NormalTextRun SCXW8663884 BCX0"> targets.</span> <span class="NormalTextRun SCXW8663884 BCX0">This can only be achieved through an improvement of wind power supply chain on the continent with producer-friendly measures that include simplifying the permitting processes for wind farms</span><span class="NormalTextRun SCXW8663884 BCX0">,</span><span class="NormalTextRun SCXW8663884 BCX0"> and accelerating access to </span><span class="NormalTextRun SCXW8663884 BCX0">funding</span> <span class="NormalTextRun SCXW8663884 BCX0">for infrastructure investments </span><span class="NormalTextRun SCXW8663884 BCX0">to</span><span class="NormalTextRun SCXW8663884 BCX0"> improve the cost-effectiveness of the </span><span class="NormalTextRun SCXW8663884 BCX0">prior steps to installation </span><span class="NormalTextRun SCXW8663884 BCX0">of new wind power capacity.</span></span><span class="EOP SCXW8663884 BCX0" data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<p><span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW139553058 BCX0">These measures are a particular priority in the development of the <strong>energy potential of </strong></span></span><strong><span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW139553058 BCX0">mini-wind power</span></span></strong><span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW139553058 BCX0">, which </span><span class="NormalTextRun SCXW139553058 BCX0">is estimated </span></span><span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW139553058 BCX0">by </span></span><a href="https://www.anev.org/wp-content/uploads/2020/06/Anev_brochure_2020web.pdf"><span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="none"><span class="NormalTextRun SCXW139553058 BCX0">ANEV </span></span></a><span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW139553058 BCX0">to be </span></span><span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><strong><span class="NormalTextRun SCXW139553058 BCX0">1.</span><span class="NormalTextRun SCXW139553058 BCX0">5</span><span class="NormalTextRun SCXW139553058 BCX0">00</span> <span class="NormalTextRun SCXW139553058 BCX0">G</span><span class="NormalTextRun SCXW139553058 BCX0">Wh</span></strong><span class="NormalTextRun SCXW139553058 BCX0"><strong> per year</strong> </span></span>on the Italian territory, <span class="TextRun SCXW139553058 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW139553058 BCX0">that can be produced by about 850 MW of installed wind power capacity.</span></span><span class="EOP SCXW139553058 BCX0" data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:276}"> </span></p>
<p>L'articolo <a href="https://www.geviwind.com/2023/05/04/upcoming-wind-power-development/">UPCOMING WIND POWER DEVELOPMENT</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>EUROPEAN WIND POWER INCENTIVE</title>
		<link>https://www.geviwind.com/2023/04/13/european-wind-power-incentive/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Thu, 13 Apr 2023 11:36:27 +0000</pubDate>
				<category><![CDATA[incentives]]></category>
		<category><![CDATA[renewables]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=756</guid>

					<description><![CDATA[<p>How much is Europe incentivising in wind power? Find out with us! vol. 12 13 April 2023 EUROPEAN WIND POWER INCENTIVE By Edoardo Simonelli, Eleonora Cacchio &#160; There are 255...</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/04/13/european-wind-power-incentive/">EUROPEAN WIND POWER INCENTIVE</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>How much is Europe incentivising in wind power?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 12</strong></p>
<p><strong>13 April 2023</strong></p>
<h2><span class="TextRun SCXW247116837 BCX0" lang="IT-IT" xml:lang="IT-IT" data-contrast="none"><span class="NormalTextRun SCXW247116837 BCX0">EUROPEAN WIND POWER</span> <span class="NormalTextRun SCXW247116837 BCX0">INCENTIVE</span></span></h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p>There are <a href="https://windeurope.org/intelligence-platform/product/wind-energy-in-europe-2022-statistics-and-the-outlook-for-2023-2027/">255 GW of wind capacity installed in Europe</a> that generated 487 TWh of electricity last year. More than 88% of wind power installations are onshore but this share is expected to decrease in favor of an increase in offshore wind energy to 25% of the 129 GW of new European wind farms planned by 2027.</p>
<p>The reasons for the lower incentive of large-scale offshore wind farms lie mainly in high input cost inflation, which is not sufficiently reflected in developers’ revenues, but also in the uninspiring market interventions by national governments that have undermined the confidence of most investors in this sector.</p>
<p>In 2022, Europe installed <strong>19,2 GW</strong> <strong>of new wind power capacity</strong> with 16,7 GW of it onshore installed mainly in Germany, Sweden and Finland, while the United Kingdom built half of the offshore installations.</p>
<p>In <strong>Italy</strong>, wind capacity has been increased by 526 MW but only 30 MW are offshore installations. Overall <strong>4.483 wind power plants are currently incentivised</strong>, with more than 85% of them having a capacity of under 200 kW.</p>
<p>Over here, incentives for wind power are monitored by the <strong>GSE</strong> (Gestore Servizi Energetici), which updates the <a href="https://www.gse.it/contatore-fer-elettriche">“renewable sources charges meter” (<strong>FER</strong>)</a> on a monthly basis. This tool makes it possible to measure <em>the indicative annual cost of the incentives granted to plants powered by renewable sources, other than photovoltaic plants</em> under “Conto Energia”, in accordance with current regulatory measures.</p>
<p>In March 2022, the indicative <a href="https://www.gse.it/documenti_site/Documenti%20GSE/Contatori/FER%20Elettriche/Tabelle.pdf">incentive cost of wind power</a> was EUR 336,8 million which translated into over 16.012 GWh per year of incentivizable wind power. At the end of the last year, wind power generation reached <strong>20.358 GWh</strong>, accounting for about 6,43% of national electricity consumption (316.827 GWh in 2022, <a href="https://download.terna.it/terna/Rapporto_Mensile_Dicembre_22_8dafd2e135eec43.pdf">Terna</a>).</p>
<p>According to the FER counter, wind energy is the most highly incentivized (non-photovoltaic) renewable source in Italy since it accounts for about 41% of the total indicative annual incentive cost (EUR <strong>817,4 million</strong>), and as many as <strong>62%</strong> <strong>of the 7.225 plants incentivised</strong> so far are wind power plants.</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/04/13/european-wind-power-incentive/">EUROPEAN WIND POWER INCENTIVE</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>INVESTING IN WIND ENERGY</title>
		<link>https://www.geviwind.com/2023/03/23/investing-in-wind-energy/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Thu, 23 Mar 2023 13:02:07 +0000</pubDate>
				<category><![CDATA[renewables]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=747</guid>

					<description><![CDATA[<p>How much investment is needed in wind power? Find out with us! vol. 11 23 March 2023 INVESTING IN WIND ENERGY By Edoardo Simonelli, Eleonora Cacchio &#160; Today, wind power...</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/03/23/investing-in-wind-energy/">INVESTING IN WIND ENERGY</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>How much investment is needed in wind power?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 11</strong></p>
<p><strong>23 March 2023</strong></p>
<h2>INVESTING IN WIND ENERGY</h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p><span data-contrast="auto">Today, wind power is the cheapest renewable resource available. Thanks to technological advancement and increased market competition there has been a <a href="https://luce-gas.it/guida/rinnovabili/eolico/quanto-costa#:~:text=In%20linea%20di%20massima%2C%20questi,%E2%82%AC%202.000%20a%20%E2%82%AC%2013.500"><strong>85% energy cost reduction</strong> over the past fifteen years</a>. </span>The cost of a kWh of electricity from on-shore wind power is getting as low as <strong>$0.04/KWh in Europe</strong>. At these rates, the price of wind power will soon be comparable to that of combined cycle natural gas facilities.</p>
<p>Nevertheless, the biggest limit to the spread of wind energy is undoubtedly its <a href="https://luce-gas.it/guida/rinnovabili/eolico">installation cost</a>, which accounts for <strong>70% of the total investment</strong>. Moreover, it is becoming increasingly difficult to install new wind farms, since the most profitable sites are already saturated.</p>
<p>The initial investment required by a 1 MW horizontal-axis wind turbine (HAWT) averages between 1100 €/kW and 2000 €/kW. The initial investment cost increases up to 5000 €/kW in the case of small-scale wind power systems (&lt; 100 kW) [1] due to the lower technology maturity and lower degree of competition within the market.</p>
<blockquote><p>Note that <a href="https://luce-gas.it/guida/rinnovabili/eolico">the cost per installed kW grows inversely proportional to the installed power</a> i.e. as the installed power increases, the unit cost per kW decreases, which is why the electricity produced by a 1 MW turbine is more than twice as cheap as a the one produced by a 10 kW micro turbine.</p></blockquote>
<p>The good news is that even the latter micro systems are investments can pay for themselves in a rather short timeframe [2]: the average 25-year operational life of the wind turbine allows to amply amortize its initial costs, with the possibility of cutting down energy costs and reselling the surplus energy produced.</p>
<p>However, the productivity of the turbine is sensitive to the type of wind turbine, local wind conditions, and altitude of the installation. The latter of which is strongly correlated to the average wind speed and capacity factor. Statistically, <em>large </em>MW class wind turbines produce <strong>2.2 MWh per year</strong> per kW, while<em> mini-domestic</em> wind power systems can produce up to <strong>1.5 MWh per year</strong> per kW.</p>
<p>To balance out the variability of wind energy production, consumers often set up <em>collective self-consumption groups</em> and <em>energy communities</em> to produce, consume and share energy generated from different renewable sources.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<h6>[1] Small wind power systems are defined as one with a rated power up to 100 kW and a maximum diameter of 20 meters, while large wind power systems exceed 1000 kW in power and 50 meters in diameter.</h6>
<h6>[2] The payback period (PBP) can be calculated as the ratio of the initial investment to the difference between the revenues from selling the wind energy produced to third parties and the annual maintenance costs of the system.</h6>
<p>L'articolo <a href="https://www.geviwind.com/2023/03/23/investing-in-wind-energy/">INVESTING IN WIND ENERGY</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MEASURING WIND POWER POTENTIAL</title>
		<link>https://www.geviwind.com/2023/03/08/measuring-wind-power-potential/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Wed, 08 Mar 2023 13:06:33 +0000</pubDate>
				<category><![CDATA[renewables]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=737</guid>

					<description><![CDATA[<p>How is wind power productivity measured? Find out with us! vol. 10 8 March 2023 MEASURING WIND POWER POTENTIAL By Edoardo Simonelli, Eleonora Cacchio &#160; Global Wind Day is still...</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/03/08/measuring-wind-power-potential/">MEASURING WIND POWER POTENTIAL</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>How is wind power productivity measured?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 10</strong></p>
<p><strong>8 March 2023</strong></p>
<h2>MEASURING WIND POWER POTENTIAL</h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p><span data-contrast="auto">Global Wind Day is still far away, but we just can&#8217;t wait until 15th June</span><span data-contrast="auto"> to celebrate wind power and tell you about the potential of wind.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">First of all, what is wind? It </span><span data-contrast="auto">is essentially kinetic energy produced by the movement of </span>air from high-pressure to low-pressure zones, which is then converted via the use of wind turbines into mechanical and eventually electrical energy.</p>
<blockquote><p><span data-contrast="auto">Wind power is among the oldest sources of energy, and was used as early as 3500 B.C. <a href="https://www.enelgreenpower.com/it/learning-hub/energie-rinnovabili/energia-eolica">by the Egyptians</a> to </span><span data-contrast="auto">manoeuvre</span> <span data-contrast="auto">boats along the Nile.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p></blockquote>
<p><span data-contrast="auto">Wind speed </span><span data-contrast="auto">is</span><span data-contrast="auto"> measured by means of an </span><b><span data-contrast="auto">anemometer</span></b><span data-contrast="auto">, from the Greek </span><i><span data-contrast="auto">anemos</span></i><span data-contrast="auto"> (wind) and </span><i><span data-contrast="auto">metron</span></i><span data-contrast="auto"> (measurement), which is an instrument that can detect changes in the physical properties of an air stream and quantify it in multiple scales of wind speed measurement (<em>m/s</em>, <em>km/h</em>, <em>ft/min</em>, <em>MPH</em> and <em>knots</em>). But wind speed is only one </span><span data-contrast="auto">factor that determines</span><span data-contrast="auto"> the extractable power from the wind, the others being air density and swept air, which comes from the radius of the air turbine blades.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">The <a href="https://en.wikipedia.org/wiki/Planetary_boundary_layer">orographic conformation of the terrain</a> must also not be underestimated since natural (e.g., hills) or man-made obstacles (such as buildings) in the terrain exert a frictional force on moving air masses causing the wind to thicken in the higher layers of the atmosphere. For this reason, in areas characterized by significant roughness such as mountainous areas, the average wind profile </span><span data-contrast="auto">steeply</span> <span data-contrast="auto">increases with increasing </span><span data-contrast="auto">altitude.</span></p>
<blockquote><p><span data-contrast="auto">In general, to calculate </span><b><span data-contrast="auto">wind productivity</span></b><span data-contrast="auto"> in a given geographical area, it is necessary to cross-reference the data of the frequency distribution of different wind speeds over a certain period (at least one year) with those of the power curve of a wind generator.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p></blockquote>
<p><span data-contrast="auto">Today, the world’s largest wind turbine is the <a href="https://insideevs.it/news/538776/turbina-eolica-piu-potente-mondo/">Haliade-X</a>, that is installed in the port area of Rotterdam (NL), 248&#215;220 meters in size and capable of yielding 14 MW of maximum power which is enough to power up to 12’000 households. </span></p>
<p><span data-contrast="auto">But this record may soon be surpassed either by the German-Spanish <a href="https://www.rinnovabili.it/energia/eolico/eolico-offshore-siemens-gamesa-record-mondiale/amp/">SG 14-222 DD</a> wind turbine installed in Thy National Park (Østerild locality, DK), which is estimated to be able to supply electricity to 18’000 households or by the Danish <a href="https://insideevs.it/news/538776/turbina-eolica-piu-potente-mondo/">V236-15.0 MW</a> wind turbine, which will be able to power up to at least 20’000 households thanks to its annual energy production of 80 GWh.</span></p>
<p>L'articolo <a href="https://www.geviwind.com/2023/03/08/measuring-wind-power-potential/">MEASURING WIND POWER POTENTIAL</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A QUICK INTRODUCTION TO THE WIND POWER MARKET</title>
		<link>https://www.geviwind.com/2023/02/22/a-quick-introduction-to-the-wind-power-market/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Wed, 22 Feb 2023 12:40:50 +0000</pubDate>
				<category><![CDATA[renewables]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=727</guid>

					<description><![CDATA[<p>How has the wind power market evolved over time? Find out with us! vol. 9 22 February 2023 A QUICK INTRODUCTION TO THE WIND POWER MARKET By Edoardo Simonelli, Eleonora...</p>
<p>L'articolo <a href="https://www.geviwind.com/2023/02/22/a-quick-introduction-to-the-wind-power-market/">A QUICK INTRODUCTION TO THE WIND POWER MARKET</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>How has the wind power market evolved over time?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 9</strong></p>
<p><strong>22 February 2023</strong></p>
<h2>A QUICK INTRODUCTION TO THE WIND POWER MARKET</h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p style="text-align: left;">From Scotsman James Blyth&#8217;s invention of the first wind turbine to produce electricity in 1887 to the present, wind power has become the second largest source of renewable energy production in the world providing <strong>about 21% of the worldwide electrical production</strong> as early as 2020 (<a href="https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2022/Jul/IRENA_Renewable_energy_statistics_2022.pdf?rev=8e3c22a36f964fa2ad8a50e0b4437870">IRENA</a>), and it is still growing.</p>
<p>When we think of a wind turbine, the <em>horizontal axis wind turbine</em> (<strong>HAWT</strong>) immediately comes to our mind since it is the most widely used and originally developed type. But there are also <em>vertical axis wind turbines</em> (<strong>VAWT</strong>s), such as GEVI&#8217;s, where the central axis of the rotor and the shaft that rotates the blades is vertical and perpendicular to the wind direction, instead of horizontal and parallel to it.</p>
<blockquote><p>The first vertical axis wind turbine was patented in 1931 by French engineer Georges Jean Marie Darrieus and was shaped like a kitchen whisk, hence the name &#8220;<a href="https://www.enelgreenpower.com/it/learning-hub/energie-rinnovabili/energia-eolica">eggbeater windmill</a>&#8220;.</p></blockquote>
<p>Then, to reduce the structural complexity of the Darrieus turbine and increase its efficiency, a wide variety of VAWTs were made in a multitude of shapes: V-shaped configuration, delta configuration, diamond configuration, giro mill configuration, and many others.</p>
<p>However, the main <strong>lift-type </strong>models of turbines are the egg-shaped Darrieus, the h-type with straight blades that looks like the letter H, and the double helix type with helical blades like a piece of DNA.</p>
<p><span class="TextRun SCXW102541546 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW102541546 BCX0">The second category of VAWTs is the </span></span><strong><span class="TextRun SCXW102541546 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW102541546 BCX0">drag-type</span></span></strong><span class="TextRun SCXW102541546 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW102541546 BCX0">, also called </span></span><span class="TextRun SCXW102541546 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SpellingErrorV2Themed SCXW102541546 BCX0">Savonius</span></span><span class="TextRun SCXW102541546 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW102541546 BCX0"> by the Finnish engineer Sigurd </span><span class="NormalTextRun SpellingErrorV2Themed SCXW102541546 BCX0">Savonius <span class="TextRun SCXW240522162 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW240522162 BCX0">who patented it</span></span></span><span class="NormalTextRun SCXW102541546 BCX0">. It includes wind turbines with a shape </span><span class="NormalTextRun SCXW102541546 BCX0">like</span><span class="NormalTextRun SCXW102541546 BCX0"> the letter S that are simpler structurally, but</span> <span class="NormalTextRun SCXW102541546 BCX0">way</span><span class="NormalTextRun SCXW102541546 BCX0"> less</span><span class="NormalTextRun SCXW102541546 BCX0"> efficient in power generation than lift-type or so-called </span><span class="NormalTextRun SpellingErrorV2Themed SCXW102541546 BCX0">Darrieus</span><span class="NormalTextRun SCXW102541546 BCX0"> ones.</span></span><span class="EOP SCXW102541546 BCX0" data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">Whatever their shape,  wind turbines with a diameter smaller than 20 m and nominal power smaller than 100 kW can be classified as </span><i><span data-contrast="auto">small wind turbines </span></i><span data-contrast="auto">and they usually favor simpler regulation and easier installation procedures.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p>
<blockquote><p>In 2020, the global small wind power market was valued at $ 7.1 billion and was estimated to grow at a CAGR of 8.8% over the next decade, reaching $ 17.1 billion by 2030 (<a href="https://www.marketresearch.com/Allied-Market-Research-v4029/Small-Wind-Power-Type-Horizontal-32036699/">Allied Market Research</a>).<span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p></blockquote>
<p><span class="TextRun SCXW219207493 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW219207493 BCX0">The recent growth of the small wind power segment, which includes a wide variety of wind turbines, from micro turbines to residential and mini turbines, is </span><span class="NormalTextRun SCXW219207493 BCX0">mainly due</span><span class="NormalTextRun SCXW219207493 BCX0"> to the</span><strong><span class="NormalTextRun SCXW219207493 BCX0"> progressive</span> </strong></span><span class="TextRun SCXW219207493 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><strong><span class="NormalTextRun SCXW219207493 BCX0">saturation of onshore </span></strong><span class="NormalTextRun SCXW219207493 BCX0"><strong>sites</strong>.</span></span></p>
<p>L'articolo <a href="https://www.geviwind.com/2023/02/22/a-quick-introduction-to-the-wind-power-market/">A QUICK INTRODUCTION TO THE WIND POWER MARKET</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>URBAN WIND OPPORTUNITIES</title>
		<link>https://www.geviwind.com/2022/11/24/urban-wind-opportunities/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Thu, 24 Nov 2022 13:14:51 +0000</pubDate>
				<category><![CDATA[renewables]]></category>
		<category><![CDATA[urban]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=675</guid>

					<description><![CDATA[<p>L'articolo <a href="https://www.geviwind.com/2022/11/24/urban-wind-opportunities/">URBAN WIND OPPORTUNITIES</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6b08826adbfd7"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row top-level"  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-animation-delay="" data-bg-overlay="false"><div class="inner-wrap row-bg-layer" ><div class="row-bg viewport-desktop"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><em>How can GEVI minimise the problem of discontinuity of renewable sources in urban areas?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 6</strong></p>
<p style="text-align: left;"><strong>24 November 2022</strong></p>
<h2>URBAN WIND OPPORTUNITIES</h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p><span data-contrast="none">Until today, it has not been possible nor economically feasible to exploit wind power in urban areas. This is for several reasons, first and foremost the large variability of wind intensity and direction in these sites, which poses serious difficulties in installing and operating traditional horizontal axis wind turbines (HAWT). Conversely, the vertical axis counterpart (VAWT) has never been cost-effective because of its poor efficiency and reliability.  </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
<p><span data-contrast="none">For this reason, the installation of <strong>photovoltaic systems</strong> is the standard solution applied in urban areas to produce renewable energy. However, photovoltaic systems require large, expensive, and polluting energy storage systems such as batteries to cover the energy needs at night and during rainy days.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
<p><span data-contrast="none">Moreover, in winter, PV systems are almost completely useless given the conjunction of the high heating power needed and the lack of sunlight, which is in turn the root cause of the need for heating. This makes standalone solar &amp; storage systems intrinsically <strong>inadequate</strong> to meet the energy needs of human activities.</span></p>
<p><span data-contrast="auto">GEVI</span><span data-contrast="auto"> is developing a</span> <span data-contrast="auto">vertical axis wind turbine with active pitch adaptation controlled by A.I., implementing a mature and game</span> <span data-contrast="auto">changing technology. This will </span><span data-contrast="auto">make a difference in the micro wind market</span><span data-contrast="auto"> and mitigate the problem of renewable discontinuity through <strong>a new distributed generation paradigm</strong>. </span></p>
<blockquote>
<p style="text-align: left;"><span data-contrast="auto">The turbine</span><span data-contrast="auto">s</span><span data-contrast="auto"> can be installed on <strong>rooftops</strong> of </span><span data-contrast="auto">both residential and industrial buildings</span><span data-contrast="auto">, </span><span data-contrast="auto">taking advantage of all the different types of wind </span><span data-contrast="auto">while</span><span data-contrast="auto"> learning </span><span data-contrast="auto">from the</span><span data-contrast="auto"> wind patterns encountered </span><span data-contrast="auto">on</span><span data-contrast="auto"> the installation site.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}"> </span></p>
</blockquote>
<p><span data-contrast="auto">GEVI’s turbines are </span><span data-contrast="auto">best suited</span><span data-contrast="auto"> for this kind of application</span><span data-contrast="auto"> for the following </span><span data-contrast="auto">key </span><span data-contrast="auto">numbers:</span></p>
<ul>
<li><b><span data-contrast="auto">noise &lt; 45 dB</span></b><span data-contrast="auto"> at 10m</span><span data-contrast="auto">: </span><span data-contrast="auto">the produced noise blends with the wind;</span></li>
<li><b><span data-contrast="auto">2.3x</span></b><b><span data-contrast="auto"> more</span></b> <b><span data-contrast="auto">e</span></b><b><span data-contrast="auto">nergy density</span></b> <span data-contrast="auto">than solar arrays</span> <span data-contrast="auto">(</span><span data-contrast="auto">at 5</span><span data-contrast="auto">.5</span><span data-contrast="auto"> m/s average wind</span><span data-contrast="auto">)</span><span data-contrast="auto">;</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></li>
<li><b><span data-contrast="auto">40% turbine price reduction</span></b> <span data-contrast="auto">when multiple turbines are installed close together: </span><span data-contrast="auto">AI allows a real-time wind data exchange between multiple nearby GEVI’s turbines,</span><span data-contrast="auto"> to </span><span data-contrast="auto">maximize energy production.</span></li>
</ul>
<p><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">Moreover, GEVI</span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">’s</span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0"> turbine architecture allows strong s</span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">avings in installation</span></span></span></span><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0"> costs </span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">and </span></span></span></span><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">extend</span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">ed</span></span></span></span> <span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">operational life</span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">,</span></span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0"> thanks to the</span></span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0"> integrated</span></span></span></span> <span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">storm safety module and load management system</span></span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">. </span></span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">A</span></span></span> <span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0"><strong>custom dashboard</strong> displaying up-to-date data on the amount of energy produced, wind conditions, and turbine operation</span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0"> will help </span><span class="NormalTextRun SCXW143050128 BCX0">monitoring</span><span class="NormalTextRun SCXW143050128 BCX0"> and </span></span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW143050128 BCX0"><span class="TrackedChange SCXW143050128 BCX0"><span class="TextRun SCXW143050128 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW143050128 BCX0">maintenance operation.</span></span></span></span></p>
<p><span class="TrackChangeTextInsertion TrackedChange SCXW103506680 BCX0"><span class="TextRun SCXW103506680 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW103506680 BCX0">In the end,</span></span></span><span class="TextRun SCXW103506680 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW103506680 BCX0"> it is easy and </span></span><span class="TrackChangeTextDeletionMarker TrackedChange SCXW103506680 BCX0"><span class="TextRun SCXW103506680 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun TrackChangeTextDeletion SCXW103506680 BCX0">extremely </span></span></span><span class="TextRun SCXW103506680 BCX0" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW103506680 BCX0">convenient to share subsystems and batteries with photovoltaic arrays to reach the goal of building or renovating <strong>Zero Energy Buildings</strong> (<strong>ZEB</strong>), giving the great advantage of making customers independent from fluctuating energy and fuel prices.</span></span></p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>L'articolo <a href="https://www.geviwind.com/2022/11/24/urban-wind-opportunities/">URBAN WIND OPPORTUNITIES</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>TELECOM TOWER MARKET OPPORTUNITIES</title>
		<link>https://www.geviwind.com/2022/11/04/telecom-tower-market-opportunities/</link>
		
		<dc:creator><![CDATA[GEVI]]></dc:creator>
		<pubDate>Fri, 04 Nov 2022 12:30:41 +0000</pubDate>
				<category><![CDATA[telecom]]></category>
		<category><![CDATA[towards the future]]></category>
		<category><![CDATA[wind energy]]></category>
		<guid isPermaLink="false">https://www.geviwind.com/?p=650</guid>

					<description><![CDATA[<p>How can GEVI turbines reduce the economic and environmental costs of on-site telecom tower power systems? Find out with us! vol. 5 04 November 2022 TELECOM TOWER MARKET OPPORTUNITIES By...</p>
<p>L'articolo <a href="https://www.geviwind.com/2022/11/04/telecom-tower-market-opportunities/">TELECOM TOWER MARKET OPPORTUNITIES</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>How can GEVI turbines reduce the economic and environmental costs of on-site telecom tower power systems?</em><br />
<em>Find out with us!</em></p>
<p style="text-align: right;"><strong>vol. 5</strong></p>
<p><strong>04 November 2022</strong></p>
<h2><strong>TELECOM TOWER MARKET OPPORTUNITIES</strong></h2>
<h6>By Edoardo Simonelli, Eleonora Cacchio</h6>
<p>&nbsp;</p>
<p><strong>Remote and off-grid telecommunication towers</strong> are energy intensive infrastructures that require an on-site energy production and storage system to cope with power outages or provide service in areas where the power grid is not present.</p>
<p>The standard approach of coupling diesel generators with lead-acid uninterruptible power supply (UPS) systems costs about <strong>10.000 euros per year </strong>and emits <strong>50 tons of CO2e per year</strong>, so it is neither economically nor environmentally sustainable.</p>
<p>At the same time, it is hard to install photovoltaic arrays or traditional horizontal axis wind turbines (HAWT) on telecom towers because the former require too much area to produce the energy needed to power the towers, and the latter are only able to take advantage of regular wind coming from a specific direction to work at nominal power for a profitable period in a year.</p>
<blockquote>
<p style="text-align: center;"><em>The compact and scalable GEVI turbines are <strong>the optimal choice</strong> to reduce the unbearable costs of on-site telecom tower power systems, <strong>both economically and environmentally</strong>.</em></p>
</blockquote>
<p>Their compact form factor and high energy density allow GEVI&#8217;s turbines to be installed on the summit of towers making use of strong winds from all directions, with negligible interference with the tower.</p>
<p>Although turbine <em>placement on the summit of tower</em> is optimal to maximize productivity and minimize interference, <em>cantilever placement on the tower body</em> is also feasible, provided sufficient distance from the upward and downward antenna.</p>
<p>In any case, there is neither electromagnetic interference nor excessive additional wind loads on the tower.</p>
<p>In addition, GEVI&#8217;s turbines can be <strong>easily integrated</strong> in the tower power infrastructure because power conversion systems are not required, and the already present batteries can be downsized.</p>
<p>Finally, GEVI&#8217;s turbine can reduce or even <strong>zero fuel consumption</strong> of telecom towers, thus solving the problem of refueling services.</p>
<p>L'articolo <a href="https://www.geviwind.com/2022/11/04/telecom-tower-market-opportunities/">TELECOM TOWER MARKET OPPORTUNITIES</a> proviene da <a href="https://www.geviwind.com">GEVI</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
